Last month, I embarked on a day trip to Barmouth from where I went on an out and back hike that reacquainted me with sights along the Mawddach estuary. This summer, as I have remarked elsewhere, has been exceptional and you could say that 2018 only has had two seasons thus far: winter and summer. Spring scarcely came at all.

The day of my Welsh outing came warm so I was glad of any shade while out walking. Being inside of a train should have helped but for one or more class 158 units without functioning air conditioning. There are not enough windows to compensate for this as I also found on a Transpennine Express journey between Leeds and Manchester in the days before the current class 185 units.

There were other problems too and the arrival of a two-carriage train in Wolverhampton was a foretaste of a less than full train schedule. Two additional carriages were added in Shrewsbury, resolving the previous crush. At Machynlleth, those extra carriages were taken off before the train continued to Aberystwyth with passengers for Barmouth and beyond needing to change to a train and a coach was going directly to Barmouth too.

That onward connection was on a train without working air conditioning so it was just as well that I was not going all the way to Pwllheli on it. It may have been that this also was the train that took me the whole way from Barmouth to Shrewsbury. The two-car unit was not augmented with an additional two carriages in Machynlleth because of a cancellation. That made for a very crowded journey in a hot train with less than happy folk on board.

Still, the situation got people talking and I was lucky enough to have a seat given that the single-track railway made for delays when a passing train was running late. That happened on both legs of the journey but people were more bothered by the stop in a crowded warm train on the way to Shrewsbury where we transferred onto a better ventilated one. It was a trip to the seaside for many and some presence of mind may have made such an outing more pleasant for them.

Arriva is finished with its Welsh franchise in October so you have to wonder if the company is as focussed on the operation as it could be, especially when staff shortages cause train cancellations on a sunny Saturday when many are travelling. In contrast, the CrossCountry trains that I used between Macclesfield and Wolverhampton were kept cool with even messages celebrating England’s World Cup quarter-final victory appearing on matrix displays in the evening. Virgin too was doing the same but any celebratory notions were tempered soon enough by their subsequent semi-final and third-place play-off defeats.

Returning to Welsh railway matters, Abellio takes over in the autumn and is promising a lot of much-needed investment after Arriva’s steady-state franchise. After all, better trains are needed in many places and long-distance journeys need longer trains too. There is much to improve so I hope that promises can be kept.