RSS

Tag Archives: Road Works

A temporary moratorium on the making of right turns

Here in Macclesfield, there is another round of traffic disruption besetting us; it’s as if it never stops. This time, it is the need to maintain overhead electricity cables that is the cause of the trouble. The result is the closure of part of the Silk Road with diversions being set in place with anyone intent on turning right on Hibel Road, Beech Lane or Jordangate being sent to the roundabouts at the end of Churchill Way or near the Tesco superstore. The Jordangate traffic lights have been switched off too so pedestrians have been advised to use the nearby footbridge over the road instead. Otherwise, there are signs and bollards littered everywhere with Beech Lane/Manchester Road being the alternative route for traffic going to and coming from north of Macclesfield. When you see the what is being done, you would suspect chaos but I haven’t really seen any apart from a traffic build-up around Sainsbury’s on Sunday. While I am travelling to work earlier than before, I have seen no real effect on bus running times either. Is because it is summer school holiday time that things are working as smoothly as they are?

 
Leave a comment

Posted on July 28, 2010 in Buses, Happenings, News, Observations

 

Tags: , , , , , ,

Death by Twitter?

The posting rate has gone down here to one a month and Twitter may be to blame for sapping it. Mind you, personal fatigue and other distractions may have had a role to play too. After all, it’s not as if the world of public transport is going to stay as quiet as it is at the moment.

For one thing, there are those cuts in public spending that loom large on the horizon. Then, there’s a transport secretary who may not be as enthusiastic about the subject as his predecessor. Well, he has been displaced from a possible role in the Treasury by the politics of coalition governments. The combination makes for testing times ahead and may make for much commentary.

The A34 bypass works trundle onward with the A535 being closed for while with Bollington Lane being reopened in the meantime to take strain. The result is that you cannot fail to notice the extra traffic on the A34 and it’s just as well that the summer school holidays are coming soon.

Elsewhere, the road system is showing the signs of a rough winter with a partial collapse on the A537 between Henbury and Broken Cross. There now has been an imperfect repair (aren’t they all these days?) and I hope that no harm came to anyone beforehand.

Victoria Road in Macclesfield has seen some resurfacing of the loose chipping variety that looks a rough job though that may change as the new surface settles. Let’s hope that it lasts better than previous attempts of the same kind on the A34 around Siddington and the B5087 around Over Alderley. They look a bit more sorry these days with some evidence of surface cracks in the case of the former. In fact, the whole road surface between Monk’s Heath and Siddington is well cracked and similar road conditions can be found on the A537 around the “Birtles Bends”.

All of these observations come from another factor that may be cutting down on new entries on here: my cycling to and from work during the long spell of fine settled weather than we have been enjoying for what feels like months now. That has seen to it that my bus travel has been curtailed though things now look less settled than they were.

Still, I have noticed a bus running on service 27 between Macclesfield and Knutsford with is electronic destination display not working. That sort of thing has happened before with those buses with paper signs appearing on screens during the time before a new display was instated. This sort of thing even afflicted a vehicle on the 130 with one side not showing anything at all. Has Arriva fixed that one yet?

To finish, you could summarise this post in a single sentiment: the cracks are showing in the transport infrastructure so how are any savings going to be made? Currently, it looks as if the cuts are going to hurt, regardless of the political rhetoric surrounding them. It was only a few years back that the now defunct Cheshire County Council proposed drastic reductions in evening bus services. The result was considerable negative feedback and much of those plans were rescinded. Could they appear again? If so, we need to make a stand in order not to let things go too far.

 
Leave a comment

Posted on July 3, 2010 in Buses, News, Observations

 

Tags: , , , , , , , , , , ,

The effects of road works

Arriva seems to have retimed the 130 services to the extent that you find drivers having to stopover at convenient places for longer that is ideal. Then, there’s having to go slower than usual to keep to the advertised timing points, a legal requirement. Seeing this does make you wonder if things have gone from one extreme to the other. There was a time when such considerations were far from being observed with the bus timings suffering as a direct result. Some people must consider that the only road works relating to the Alderley Edge Bypass to be a major upheaval. While there can be no doubt that there’s potential for major disruption, you do have to ask if there has been overcompensation.

The same thing affects the 27 too, it seems. If you want to get from Knutsford to Alderley Park, you have to deal with a much reduced service level. The question arises is whether this is temporary or not. One would hope that it is the former and not the latter but you have to wonder in these times when austerity has been trumpeted by a new government. Who knows?

 
Leave a comment

Posted on June 14, 2010 in Buses, News, Observations, Timetables

 

Tags: , , , , , , , , , , , , , , ,

Backing up as far as Henbury…

The current spate of road works continues. As if the attentions given to the A34 aren’t enough, we have gas network works blighting Macclesfield and the Broken Cross roundabout is the latest victim. Because of the need to rip up part of Gawsworth Road, one side of the roundabout is shut with temporary traffic lights controlling things. That they alternative between the three other roads leading into the roundabout is little consolation to anyone joining a queue at Henbury. It cannot be good on Chester Road either but I have not passed that way so I cannot confirm the situation. Saying that, things haven’t been so bad from the Fallibroome Road side but you can escape around by Upton Priory and the B5087 if needs be. If I were driving this way everyday, I’d be very tempted to find another route until all is over.

Needless to say, bus services like the 130 Macclesfield-Manchester, the 27 Macclesfield-Knutsford and the 19 Macclesfield-Prestbury are getting caught up in all of this and it was particularly bad on Friday evening. So, it’s very much a case of keeping an eye on the real-time bus tracker to see how things are going because things are almost certain to veer markedly away from the timetable. Let’s hope that this doesn’t go on too long because it is having a major impact. Do the people who plan these things realise what disruption gets caused?

Update: Traffic didn’t seem so bad when coming home through Broken Cross this evening. Have people decided to divert around the roadworks?

 
Leave a comment

Posted on April 19, 2010 in Buses, Happenings, Observations, Timetables

 

Tags: , , , , , , , , , , , , , , , , , , ,

A spot of public information advertising on wheels

Somehow, Arriva has come into the possession of an Optare Solo (admittedly, it looks a bit tiddly on a route normally operated using full size Dennis Darts and the occasional double decker but never underestimate how many can be fitted into these buses) with a sign on board dating from the days of Chester City Transport. It’s like a vague memory that the erstwhile municipal operation had at least one bus with Cheshire County Council “Cheshire Rider” livery and this, with its dark blue paintwork, might have been one of them. That recollection leads me to wonder if Arriva has the bus on loan from Cheshire East Council, especially with the local authority’s logo featured on the sides of the vehicle.

This week, it has appeared operating 130 services between Macclesfield and Manchester and carries signage publicising the real time bus tracker that has been available since the end of last year. The strap line goes something like “to find out if the 130 is on time, go online”. With that sort of livery and the mention of Cheshire East Council, you’d expect the bus to have a GPS tracker but I have seen little evidence of that so far. Maybe, it’s one of life’s little ironies.

It also has appeared at the same time that Arriva has updated the 130 timetable to cope with all the upheaval that the A34 bypass and associated works has brought to Alderley Edge and Nether Alderley. Adding to that is what is happening in Macclesfield with roads being dug up all around the town to replace old gas mains. It’s like everything is happening all at once but we’ll have to hop that they stop up soon enough.

 
Leave a comment

Posted on April 14, 2010 in Buses, Observations, Timetables

 

Tags: , , , , , , , , , , ,