On Saturday, I embarked on a trip to Wales and I happened to have the misfortune to travel when there were problems with a set of signals in the Trent valley. That meant that a connection from Stoke-on-Trent to Crewe was late because it was a London Midland service from London to Crewe. That meant that my planned journey from Macclesfield to Bangor no longer was possible.
The 13:13 London Midland service turned up after the 13:34 East Midlands service from Derby so I was travelling on that instead. The result was that the 13:49 Virgin train to Chester left without me even with its being delayed too. It was the 14:23 Arriva Trains Wales service that got me there where I caught a train to Llandudno Junction from where I took another to Bangor, where I arrived at 16:35 and not at 15:28 as I had hoped. Even so, no serious damage was done to my plans and I enjoyed a lovely sunny evening regardless.
That last outbound train spent longer in Conwy than expected. A train conductor had not warned cyclists that they needed to be at the centre of the train to disembark. The result was that the rest of us were left waiting while the cyclists realised where they needed to be and made their way there. Only for having the man staffing the refreshments trolley in our carriage, quite a few of us would been ignorant of what was going on. It was another example of a day when trains were in no hurry.
On the return journey the next day, there was only one delay and that was due to train coupling in Llandudno Junction. The sunny weather had lured a fair few folk to the north Wales coast so Arriva Trains Wales were making sure at least one of their services was long enough to convey all who came to catch it, something from which other operators would do well to learn. Six minutes may have been lost but that was no perturbation to my journey home because there was enough slack to cope with it. My arrival time in Macclesfield didn’t have to change like that in Bangor the day before.
Tags: Arriva, Bangor, Cheshire, Chester, Crewe, Delays, England, Llandudno Junction, London Midland, Macclesfield, National Rail, Stoke-on-Trent, Timetables, Trains, Virgin, Wales, Weather
It now appears that the current economic climate and the curtailments in public spending have affected two companies based not too far away from where I live. The first is the merger of the operations of Bowers and the Trent Barton depot in Dove Holes near Buxton. Apparently, Centrebus and Trent Barton are embarking on a joint venture that is to be based in Dove Holes with the Chapel-en-Frith depot looking set to close. The name for the new company is to be High Peak and is to grace the roads of Cheshire as well as Derbyshire since Bowers run quite a few services around Macclesfield and Knutsford. The 199 Buxton-Stockport-Manchester Airport route is another one that is bound to be moved to the new company and that means that Greater Manchester will be included among the areas served too. The long distance Transpeak service between Manchester, Buxton, Derby and Nottingham is to stay operating like it does today with the Dove Holes depot staying in use as the northern base. It is going to take time for the changes to come into place but this autumn could see the first signs of the merger once the reorganisation along with the paperwork and authorisations that it entails have been completed.
In another development, D&G has felt the effects of bus subsidy cuts made by Stoke-on-Trent City Council. That situation must have made an approach by Arriva regarding acquisition of D&G’s North Staffordshire business look very attractive. The result is that Arriva is buying it to build up Wardle Transport, a subsidiary that it has in the area. After the sale, D&G will continue to trade from Crewe and its sister company in the West Midlands, Midland, is unaffected by the change.
The announcements for both of these changes mentioned the reality of a more challenging trading environment. This is the more pertinent for D&G because one of it founders set it up after the Labour party’s landslide election victory of 1997 in the hope of the then new government increasing the funding for bus services, something that actually did happen. Now that the proverbial pendulum is swinging in the other direction, we are seeing signs of consolidation and, in some unfortunate cases such as McKindless in Glasgow (once Scotland’s largest independent bus operator), company failures. While there can be no doubt that the bus business is facing a changed environment, it might have its upshots too with higher fuel costs and a reduced standard of living making families’ having an extra car more expensive than it was. If that were to increase bus patronage, it could compensate for the reductions in public spending but only time will tell whether or not that comes to pass, especially with some councils such as Northamptonshire having some very draconian proposals.
Tags: 199, 27, 300, 58, 60, 64, Arriva, Bowers, Buses, Buxton, Centrebus, Chapel-en-le-Frith, Cheshire, Connect 19, Crewe, D&G, Derby, Derbyshire, Dove Holes, England, Glasgow, High Peak, Macclesfield, Manchester, Manchester Airport, McKindless, Midland, Northamptonshire, Nottingham, Prestbury, Spending Cuts, Staffordshire, Stockport, Stoke-on-Trent, Stoke-on-Trent City Council, Transpeak, Trent Barton, Wardle Transport, West Midlands, Whirley
Last evening’s journey home turned out to be a hell of a lot more interesting than I expected. While I was aware of water mains works resulting in temporary traffic lights on the Wilmslow side of Alderley Edge, the one thing that I hadn’t expected was a road traffic accident to take place in the same area as well. Emergency services were on the scene with the telltale blue lights flashing atop their vehicles.
As a result, the bus driver turned around his bus and asked if anyone was going to Alderley Edge before going on to say that they needed to walk the rest of the way. However, the sight of moving cars prompted a protest from the one passenger who was affected. To placate him, the bus was turned around again but driver still decided that there was no way through for him and the annoyed passenger had no option but to leave at that point. Before this settlement was reached, some untoward comments about driving quality and another passenger decided to act as a mediator in order to bring the situation to a somewhat dignified close.
After that, the bus was again turned in the road and it seemed to be a difficult thing to do the second time around too. Alderley Edge wasn’t served and we were taken around the Alderley Edge by-pass instead. To the driver’s credit, we did call at Alderley Park even if we went the opposite way around to what is usual and passage over every speed bump was jarring. In the end, we all got home and that probably is more than could be said for anyone waiting in Alderley Edge; I don’t envy them one bit and I hope any injuries in that accident weren’t fatal or serious.
Update: Interestingly, I since discovered that the previous bus for Macclesfield got through the accident area to serve Alderley Edge. What was different when mine was passing? Did one driver see things differently from another or did something change between the passage of both vehicles (the second was 15 minute late too)? It is hard to answer those questions exactly so I’ll leave them open for now.
Tags: 130, Alderley Edge, Buses, Cheshire, England, Macclesfield, Timetables, Traffic, Wilmslow
In the last few days, two types of services have been coming to an end. First up is the well-regarded Wrexham, Shropshire and Marylebone Railway company which stopped running services between Wrexham and London on Friday. While Virgin will continue to run one service each way from Wrexham to London and back, most will find themselves going via Chester or some other route. Sadly, I never got to try WSMR out for size so I don’t know what I’ve missed. Nevertheless, I do know what it’s like to be travelling on the last services of something that were a good thing.
My reason for saying that is that DFDS Norfolkline’s last sailing from Birkenhead to Dublin is departing in just under an hour (checking in probably has closed in by now). A day trip to Dublin and Howth had me traveling on the last sailing from Dublin to Birkenhead last night and it was a forlorn event. You could hear the captain’s voice breaking as he announced the end of something that had been going since 1995. Indeed, other members of the crew were welling up at times too. After all, this is something that could be missed. P&O do operate a ferry from Liverpool to Dublin and back but they don’t accept foot passengers like the others did. The result is that foot passengers will be losing a seven hour sailing that allowed the chance for some more sleep when travelling between Merseyside and the Irish Republic. Everyone will need to go to Holyhead or some other port now.
The service seemed busy enough on the seven hour sailing that I undertook but I don’t know how things were going during the week or on daytime sailings and the Irish economy isn’t going very well at the moment while the British one is having its troubles too; the Holyhead-Dublin sailing that I used in the middle of the day wasn’t that busy so that might be a hint. Then, there was the takeover of Norfolkline by DFDS so that might result in a change of priorities too. Still, the Birkenhead-Belfast operation continues though the days of getting evening meals and breakfast on the price of the sailing are gone after the end of the month. Fares will cost more by the looks of things and you’ll need to pay for any food as well. Was it impossible to keep the Dublin route going on this basis?
Good things sadly can come to an end and I suppose the WSMR’s demise is but another example that sounds very similar to the sea travel tail that I have related here. My only wish is that everything works out OK for the staff caught up in both of these less than positive changes. There’s something about both that makes them sound like the ends of eras.
Update 2011-01-31: There seems to be swathe of route discontinuations in train with BMI pulling its Glasgow-London service and Air Southwest doing the same with its Newquay-Gatwick and Plymouth-Gatwick runs. Interestingly, there is no mention of the news on the former’s website while it is there on the latter’s. In truth, DFDS wasn’t so communicative about the Dublin-Birkenhead route either.
Tags: Birkenhead, Chester, DFDS, Dublin, England, Ireland, Liverpool, London, Norfolkline, Shrewsbury, Timetables, Trains, Virgin, Wales, West Coast, Wrexham, Wrexham and Shropshire, WSMR
Out of curiosity, I decided to explore the Megabus website for the U.K. and it surprised me to see how low some of their prices were. Apparently, there’s a seat sale on at the moment too so that may explain some of those less than £5. However, it’s easy to see the attraction of what aren’t so infrequent services from Manchester to places such as Leeds, Birmingham, Glasgow and London. With the recent increases in train fares, even a ticket costing less than £20 has to look tempting. Is that why the though of savouring their services to see what they’re like has entered my head?
While checking out express coach services, I also decided to take a look at what Greyhound offers to the U.K. traveller these days and it looks as if things have expanded beyond the London services to the south coast of England with which they started. For instance, regular services between Cardiff and Swansea are now on offer with the frequency making them look like the Welsh version of the Scottish Citylink service between Edinburgh and Glasgow or the National Express one between Leeds, Manchester and Liverpool. It looks a good move forward and I hope that it’s attracting a good level custom. Also coming within the Greyhound fold is the overnight service between London and Scotland (Hamilton, Glasgow, Edinburgh) that First Glasgow took over from Silver Choice. All the while, it’s south of England tally of destinations increases with Winchester being a recent addition to those like Portsmouth, Poole, Southampton, Bournemouth, Fareham, Ringwood (for the New Forest) and the Isle of Wight. All in all, Greyhound is growing in Britain so there must be some success being had somewhere. Maybe the attractive prices might have something to do with it because I did glimpse a few going for £1 plus booking fee.
All in all, it looks as if express coach travel might be on the up and it would not be a bad thing if a decent network built up in England and Wales, even if it meant travelling with different operators on a single journey. The looming increases in train fares are presenting an opportunity and I wonder if anyone is out there waiting to take it. Now mightn’t be a bad time to spend a little longer travelling in order to save a little cash when it is a scarcer commodity than used to be case a few years ago.
Tags: Bournemouth, Cardiff, Coaches, Edinburgh, England, Fareham, First, Glasgow, Greyhound, Hamilton, Isle of Wight, Leeds, Liverpool, London, Manchester, Megabus, National Express, New Forest, Poole, Portsmouth, Ringwood, Scotland, Scottish Citylink, Southampton, Stagecoach, Swansea, Ticketing, Wales, Yorkshire